PDI Pilots Sustainable Waste Management Project with Akkodis

Executive Board Hero - Top Bg Gradient

2024

Successful commissioning

2

Technology stages rotary kiln + gasification reactor

100%

Client satisfaction with Akkodis’ on-time delivery

“The experience was entirely positive”, says Michal Boška, “Both in terms of adherence to the time schedules and in terms of flexibility in responding to our specific requirements for certain changes that proved necessary during the implementation.”

Michal Boška

Chief Technology Officer, PDI

Results

PDI received production drawings for the rotary tube module, enabling them to manufacture the system independently. The plant was successfully commissioned in the summer of 2024.

The client’s technology is the only mobile installation for disposing hazardous hospital waste on a river barge platform. With the first stage of Akkodis' rotary kiln technology, the client can process the diverse nature of hospital waste in a stable and efficient manner.

“Akkodis' rotary kiln technology with our second high-temperature gasification reactor has proven to be a viable solution for many types of waste and the production of stable syngas, proving that this is the right path for the market segment we want to address”, says Michal Boška, Chief Technology Officer at PDI. “The experience was entirely positive in terms of adherence to the time schedules and of flexibility in responding to our specific requirements for changes that proved necessary during the implementation.”

Additional Resources

Watch the videos to learn more about PDI NAVI-MED 500 project and read Akkodis' Thinkers & Makers magazine to explore additional perspectives and related insights.

PDI Early Stage Video arrow_circle_right

PDI NAVI-MED 500 Project Video arrow_circle_right

Akkodis Thinkers & Makers Magazine Articlearrow_circle_right

hero image